Home > Equipment, Nautel, NV20 > Does Your Transmitter Run on 66 Vac?

Does Your Transmitter Run on 66 Vac?

Friday and my family was in L.A. I was planning on taking the train up to meet with them as it as Grandma’s birthday, but it was contingent on how the week was heading. South, that is where it was heading!
Sitting at the my desk doing a couple of things the the silence alarm goes off.  Not just one, but two stations collocated.  For that to happen their are only two things that will cause that, main STL to the site or power.  I quickly switch one to the our Aux site, the other I poke at and switch STLs.  Back on.  Off to the site I go.  Mind you I get a low power warning, and both transmitters were on at about 3kW each.  Each transmitter is a Nautel NV20, the very ones that I have posted about before.  In addition a get an high room temperature alarm, so HVAC is down.

I get to the site.  Sure enough the TV station’s generator is running.  I open my door and greeted with hot air.  My lights work, but two of 3 UPSs are beeping away running on battery.  Looking at my surge suppressors, two phases are missing!  Yes, two, and one NV20 was on.  I had turned one off earlier when I switched that station to an Aux site.  Out comes the Fluke and I start measuring the phases.  One is running fine at 120V, the other two are running 66V.  One rack is powered while the other two are on battery.  I make provisions to route power to equipment in a backed up rack preparing for the batteries to die.  I look at the transmitter running.  3.6kW TPO and the status tells me 2 phases are missing.  All I can say is, “wow.”  I had a similar incident years ago with a single phase loss, but this time 2!

Once I had my stuff stable, I noticed the power company, SDG&E, was already outside on the street.  Ah, they were doing something and it went wrong.  Of course the guy in the truck had no update nor did he know where the issue was.  The guys at the fire station, following protocol, had moved their trucks out and were talking with another SDG&E person.  Eventually 3 trucks were up the street.  Within about 45 minutes of being on site, power was restored.

Chalk another one up to Nautel.  The power distribution and fold-back on the NV20s worked flawless.  Needless to say, my HVAC recovered and all other equipment survived the trauma.  Let’s see if the rest of the weekend remains quiet.

 

Cheers!

Advertisements
Categories: Equipment, Nautel, NV20 Tags: , , ,
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: